Search a title or topic

Over 20 million podcasts, powered by 

Player FM logo
Artwork

Content provided by Louis & Chris. All podcast content including episodes, graphics, and podcast descriptions are uploaded and provided directly by Louis & Chris or their podcast platform partner. If you believe someone is using your copyrighted work without your permission, you can follow the process outlined here https://podcastplayer.com/legal.
Player FM - Podcast App
Go offline with the Player FM app!

A Tale of Two Rail Terminals: Boston's Century Old Transit Quirk

27:04
 
Share
 

Manage episode 501120048 series 3548113
Content provided by Louis & Chris. All podcast content including episodes, graphics, and podcast descriptions are uploaded and provided directly by Louis & Chris or their podcast platform partner. If you believe someone is using your copyrighted work without your permission, you can follow the process outlined here https://podcastplayer.com/legal.

Boston's North and South stations serve as critical transit hubs but remain disconnected despite a century of failed attempts to link them.
• North Station serves 40,000 daily commuters from northern suburbs and connects to Amtrak's Downeaster route
• South Station handles 60,000 daily commuters and serves as terminus for multiple Amtrak routes including Acela
• Transferring between stations requires a 16-25 minute journey using multiple subway lines
• Five major attempts to connect the stations have failed since the 1930s due to funding issues and political obstacles
• The Big Dig highway project complicated future connection possibilities by placing a tunnel between the stations
• Current estimated costs for connecting the stations range from $12-21 billion
• Engineering challenges include tunneling under existing infrastructure, electrifying commuter rail, and working in a dense urban environment
• Advocates continue pushing for the connection citing climate goals and regional transit equity
If you want to support the show, the best ways to do so are via our Patreon, Buy Me a Coffee, or check out our merch store!
Send us a text

Support the show

  continue reading

Chapters

1. Introduction to Boston's Station Dilemma (00:00:00)

2. North and South Station Importance (00:01:27)

3. Testing the Connection Between Stations (00:05:20)

4. Historical Origins of Disconnected Terminals (00:09:29)

5. Failed Attempts to Connect the Stations (00:14:33)

6. Modern Challenges and Future Possibilities (00:22:36)

7. Closing Thoughts and Viewer Engagement (00:26:40)

88 episodes

Artwork
iconShare
 
Manage episode 501120048 series 3548113
Content provided by Louis & Chris. All podcast content including episodes, graphics, and podcast descriptions are uploaded and provided directly by Louis & Chris or their podcast platform partner. If you believe someone is using your copyrighted work without your permission, you can follow the process outlined here https://podcastplayer.com/legal.

Boston's North and South stations serve as critical transit hubs but remain disconnected despite a century of failed attempts to link them.
• North Station serves 40,000 daily commuters from northern suburbs and connects to Amtrak's Downeaster route
• South Station handles 60,000 daily commuters and serves as terminus for multiple Amtrak routes including Acela
• Transferring between stations requires a 16-25 minute journey using multiple subway lines
• Five major attempts to connect the stations have failed since the 1930s due to funding issues and political obstacles
• The Big Dig highway project complicated future connection possibilities by placing a tunnel between the stations
• Current estimated costs for connecting the stations range from $12-21 billion
• Engineering challenges include tunneling under existing infrastructure, electrifying commuter rail, and working in a dense urban environment
• Advocates continue pushing for the connection citing climate goals and regional transit equity
If you want to support the show, the best ways to do so are via our Patreon, Buy Me a Coffee, or check out our merch store!
Send us a text

Support the show

  continue reading

Chapters

1. Introduction to Boston's Station Dilemma (00:00:00)

2. North and South Station Importance (00:01:27)

3. Testing the Connection Between Stations (00:05:20)

4. Historical Origins of Disconnected Terminals (00:09:29)

5. Failed Attempts to Connect the Stations (00:14:33)

6. Modern Challenges and Future Possibilities (00:22:36)

7. Closing Thoughts and Viewer Engagement (00:26:40)

88 episodes

All episodes

×
 
Loading …

Welcome to Player FM!

Player FM is scanning the web for high-quality podcasts for you to enjoy right now. It's the best podcast app and works on Android, iPhone, and the web. Signup to sync subscriptions across devices.

 

Copyright 2025 | Privacy Policy | Terms of Service | | Copyright
Listen to this show while you explore
Play