Search a title or topic

Over 20 million podcasts, powered by 

Player FM logo
Artwork

Content provided by Michigan Department of Transportation. All podcast content including episodes, graphics, and podcast descriptions are uploaded and provided directly by Michigan Department of Transportation or their podcast platform partner. If you believe someone is using your copyrighted work without your permission, you can follow the process outlined here https://podcastplayer.com/legal.
Player FM - Podcast App
Go offline with the Player FM app!

Herculean effort results in a new bridge after historic mid-Michigan flooding

24:46
 
Share
 

Manage episode 444329704 series 2920850
Content provided by Michigan Department of Transportation. All podcast content including episodes, graphics, and podcast descriptions are uploaded and provided directly by Michigan Department of Transportation or their podcast platform partner. If you believe someone is using your copyrighted work without your permission, you can follow the process outlined here https://podcastplayer.com/legal.

On this week’s edition of the Talking Michigan Transportation podcast, a conversation about the extraordinary efforts that culminated with the opening of a new and improved bridge near Edenville.

Jack Hofweber, manager of the Michigan Department of Transportation’s (MDOT) Mt. Pleasant Transportation Service Center, reflects on the heavy rains and floods that breached dams and ravaged roads and bridges in several counties in 2020, just weeks after many people went into lockdown because of the pandemic.

In what meteorologists concluded was a 500-year event, the flooding that resulted from up to 7 inches of rain in Midland, Saginaw and surrounding counties damaged homes and property, forced more than 10,000 people to evacuate and most spectacularly destroyed one power dam and severely damaged another.

One year after the floods, an MLive drone video captured the changes.

On Monday, Oct. 7, MDOT Director Bradley C. Wieferich, elected officials, contractors and labor groups celebrated the opening of the new bridge, as highlighted in this video.

With climate change and sustained high water creating headaches for shoreline communities across the state and officials from several state agencies planning for more, the challenge of planning and building more resilient transportation infrastructure, especially during an ongoing period of underinvestment, remains acute.

Other relevant links:

https://www.mlive.com/news/saginaw-bay-city/2020/05/how-a-spring-rainstorm-became-a-500-year-flood-event-in-mid-michigan.html

https://www.michiganradio.org/post/governor-expands-state-emergency-declaration-include-arenac-gladwin-and-saginaw-counties

  continue reading

Chapters

1. Herculean effort results in a new bridge after historic mid-Michigan flooding (00:00:00)

2. Rebuilding Michigan Transportation After Flooding (00:00:08)

3. Bridge Innovations and Emergency Contracting (00:09:51)

4. Success in Michigan Transportation Podcast (00:24:04)

247 episodes

Artwork
iconShare
 
Manage episode 444329704 series 2920850
Content provided by Michigan Department of Transportation. All podcast content including episodes, graphics, and podcast descriptions are uploaded and provided directly by Michigan Department of Transportation or their podcast platform partner. If you believe someone is using your copyrighted work without your permission, you can follow the process outlined here https://podcastplayer.com/legal.

On this week’s edition of the Talking Michigan Transportation podcast, a conversation about the extraordinary efforts that culminated with the opening of a new and improved bridge near Edenville.

Jack Hofweber, manager of the Michigan Department of Transportation’s (MDOT) Mt. Pleasant Transportation Service Center, reflects on the heavy rains and floods that breached dams and ravaged roads and bridges in several counties in 2020, just weeks after many people went into lockdown because of the pandemic.

In what meteorologists concluded was a 500-year event, the flooding that resulted from up to 7 inches of rain in Midland, Saginaw and surrounding counties damaged homes and property, forced more than 10,000 people to evacuate and most spectacularly destroyed one power dam and severely damaged another.

One year after the floods, an MLive drone video captured the changes.

On Monday, Oct. 7, MDOT Director Bradley C. Wieferich, elected officials, contractors and labor groups celebrated the opening of the new bridge, as highlighted in this video.

With climate change and sustained high water creating headaches for shoreline communities across the state and officials from several state agencies planning for more, the challenge of planning and building more resilient transportation infrastructure, especially during an ongoing period of underinvestment, remains acute.

Other relevant links:

https://www.mlive.com/news/saginaw-bay-city/2020/05/how-a-spring-rainstorm-became-a-500-year-flood-event-in-mid-michigan.html

https://www.michiganradio.org/post/governor-expands-state-emergency-declaration-include-arenac-gladwin-and-saginaw-counties

  continue reading

Chapters

1. Herculean effort results in a new bridge after historic mid-Michigan flooding (00:00:00)

2. Rebuilding Michigan Transportation After Flooding (00:00:08)

3. Bridge Innovations and Emergency Contracting (00:09:51)

4. Success in Michigan Transportation Podcast (00:24:04)

247 episodes

All episodes

×
 
Loading …

Welcome to Player FM!

Player FM is scanning the web for high-quality podcasts for you to enjoy right now. It's the best podcast app and works on Android, iPhone, and the web. Signup to sync subscriptions across devices.

 

Copyright 2025 | Privacy Policy | Terms of Service | | Copyright
Listen to this show while you explore
Play