Go offline with the Player FM app!
Installing ESD Flooring in a 24/7 facility without disrupting operations
Archived series ("Inactive feed" status)
When? This feed was archived on July 06, 2025 14:14 (). Last successful fetch was on June 27, 2021 14:07 ()
Why? Inactive feed status. Our servers were unable to retrieve a valid podcast feed for a sustained period.
What now? You might be able to find a more up-to-date version using the search function. This series will no longer be checked for updates. If you believe this to be in error, please check if the publisher's feed link below is valid and contact support to request the feed be restored or if you have any other concerns about this.
Manage episode 248914615 series 2495711
Installing a floor in a 24/7 operational facility comes with its own set of challenges. As with any flooring installation, it’s important to consider logistics: Will chemicals be used? Adhesives? Coatings? Are there toxins or odors to deal with? What is the condition of the current floor or subfloor? Will the old floor require removal? Dave and Rick discuss the optimal way to install an ESD floor in 24/7 operational spaces – without adhesive or chemicals and with neither downtime nor disruption.
The post Static Bursts (Ep #7): Installing ESD Flooring in a 24/7 Facility Without Disrupting Operations appeared first on StaticWorx Learning Center.
21 episodes
Archived series ("Inactive feed" status)
When? This feed was archived on July 06, 2025 14:14 (). Last successful fetch was on June 27, 2021 14:07 ()
Why? Inactive feed status. Our servers were unable to retrieve a valid podcast feed for a sustained period.
What now? You might be able to find a more up-to-date version using the search function. This series will no longer be checked for updates. If you believe this to be in error, please check if the publisher's feed link below is valid and contact support to request the feed be restored or if you have any other concerns about this.
Manage episode 248914615 series 2495711
Installing a floor in a 24/7 operational facility comes with its own set of challenges. As with any flooring installation, it’s important to consider logistics: Will chemicals be used? Adhesives? Coatings? Are there toxins or odors to deal with? What is the condition of the current floor or subfloor? Will the old floor require removal? Dave and Rick discuss the optimal way to install an ESD floor in 24/7 operational spaces – without adhesive or chemicals and with neither downtime nor disruption.
The post Static Bursts (Ep #7): Installing ESD Flooring in a 24/7 Facility Without Disrupting Operations appeared first on StaticWorx Learning Center.
21 episodes
All episodes
×Welcome to Player FM!
Player FM is scanning the web for high-quality podcasts for you to enjoy right now. It's the best podcast app and works on Android, iPhone, and the web. Signup to sync subscriptions across devices.