Content provided by Anthony Power & Bryce McNallie, Anthony Power, and Bryce McNallie. All podcast content including episodes, graphics, and podcast descriptions are uploaded and provided directly by Anthony Power & Bryce McNallie, Anthony Power, and Bryce McNallie or their podcast platform partner. If you believe someone is using your copyrighted work without your permission, you can follow the process outlined here https://podcastplayer.com/legal.
Player FM - Podcast App
Go offline with the Player FM app!

IREN - Childress Facility Tour & Analysis!

22:41
 
Share
 

Manage episode 518931359 series 3570269
Content provided by Anthony Power & Bryce McNallie, Anthony Power, and Bryce McNallie. All podcast content including episodes, graphics, and podcast descriptions are uploaded and provided directly by Anthony Power & Bryce McNallie, Anthony Power, and Bryce McNallie or their podcast platform partner. If you believe someone is using your copyrighted work without your permission, you can follow the process outlined here https://podcastplayer.com/legal.

We tour IREN’s Childress campus to see how power, cooling, and repeatable design create a mega-scale platform for Bitcoin mining today and HPC AI tomorrow. From grid ties and substation planning to closed-loop water and 20-year infrastructure, we map the strategy behind the Microsoft deal.
• community impact in Childress and local hiring
• 750 MW campus scale with 500 MW operating
• grid-connected power and 345 kV lines
• substation readiness and long-lead equipment
• air-cooled Bitcoin halls and noise control
• onsite repair shop and uptime culture
• closed-loop cooling, wells and water logistics
• Microsoft five-year GPUs vs 20-year buildings
• future-proofing for higher rack density
• safety, security and site operations at scale
Hit the like button if you're an iron shareholder, and feel free to subscribe
Anthonys Info:

Website:

https://www.powermininganalysis.com

X:

https://twitter.com/cazenove_uk

Patreon:

https://www.patreon.com/Cazenove_UK

Bryce's Info:

X:

https://twitter.com/McnallieM

Patreon:

https://www.patreon.com/McNallieMoney

Merch:

https://shop.mcnalliemoney.com/

Website:

https://www.mcnalliemoney.com

Business Inquiries:

Email - [email protected]

  continue reading

Chapters

1. Tour Kickoff And Community Impressions (00:00:00)

2. Scale Of The Childress Campus (00:03:10)

3. Grid Power And Substation Insights (00:06:30)

4. Inside The Bitcoin Mining Halls (00:09:30)

5. Onsite Repairs And Uptime Strategy (00:13:20)

6. Water, Cooling, And Closed-Loop Design (00:17:20)

7. Microsoft Deal And 20-Year Infrastructure (00:21:10)

443 episodes

Artwork
iconShare
 
Manage episode 518931359 series 3570269
Content provided by Anthony Power & Bryce McNallie, Anthony Power, and Bryce McNallie. All podcast content including episodes, graphics, and podcast descriptions are uploaded and provided directly by Anthony Power & Bryce McNallie, Anthony Power, and Bryce McNallie or their podcast platform partner. If you believe someone is using your copyrighted work without your permission, you can follow the process outlined here https://podcastplayer.com/legal.

We tour IREN’s Childress campus to see how power, cooling, and repeatable design create a mega-scale platform for Bitcoin mining today and HPC AI tomorrow. From grid ties and substation planning to closed-loop water and 20-year infrastructure, we map the strategy behind the Microsoft deal.
• community impact in Childress and local hiring
• 750 MW campus scale with 500 MW operating
• grid-connected power and 345 kV lines
• substation readiness and long-lead equipment
• air-cooled Bitcoin halls and noise control
• onsite repair shop and uptime culture
• closed-loop cooling, wells and water logistics
• Microsoft five-year GPUs vs 20-year buildings
• future-proofing for higher rack density
• safety, security and site operations at scale
Hit the like button if you're an iron shareholder, and feel free to subscribe
Anthonys Info:

Website:

https://www.powermininganalysis.com

X:

https://twitter.com/cazenove_uk

Patreon:

https://www.patreon.com/Cazenove_UK

Bryce's Info:

X:

https://twitter.com/McnallieM

Patreon:

https://www.patreon.com/McNallieMoney

Merch:

https://shop.mcnalliemoney.com/

Website:

https://www.mcnalliemoney.com

Business Inquiries:

Email - [email protected]

  continue reading

Chapters

1. Tour Kickoff And Community Impressions (00:00:00)

2. Scale Of The Childress Campus (00:03:10)

3. Grid Power And Substation Insights (00:06:30)

4. Inside The Bitcoin Mining Halls (00:09:30)

5. Onsite Repairs And Uptime Strategy (00:13:20)

6. Water, Cooling, And Closed-Loop Design (00:17:20)

7. Microsoft Deal And 20-Year Infrastructure (00:21:10)

443 episodes

Alle episoder

×
 
Loading …

Welcome to Player FM!

Player FM is scanning the web for high-quality podcasts for you to enjoy right now. It's the best podcast app and works on Android, iPhone, and the web. Signup to sync subscriptions across devices.

 

Copyright 2025 | Privacy Policy | Terms of Service | | Copyright
Listen to this show while you explore
Play