Content provided by Pascal Hartig. All podcast content including episodes, graphics, and podcast descriptions are uploaded and provided directly by Pascal Hartig or their podcast platform partner. If you believe someone is using your copyrighted work without your permission, you can follow the process outlined here https://podcastplayer.com/legal.
Player FM - Podcast App
Go offline with the Player FM app!

74: Taking the plunge - The engineering journey of building a Subsea Cable

39:49
 
Share
 

Manage episode 479822195 series 2390222
Content provided by Pascal Hartig. All podcast content including episodes, graphics, and podcast descriptions are uploaded and provided directly by Pascal Hartig or their podcast platform partner. If you believe someone is using your copyrighted work without your permission, you can follow the process outlined here https://podcastplayer.com/legal.

To ensure that everyone has access to resilient, high-speed and low-latency connections to Meta services, no matter where in the world they are, Meta makes large-scale investments into subsea cable infrastructure. The recently announced Project Water worth will, Once complete, reach five major continents and span over 50,000 km (longer than the Earth’s circumference), making it the world’s longest subsea cable project using the highest-capacity technology available.

In this episode, host Pascal talks with another Pascal and his colleague Andy who are involved at every stage of these projects and share the surprising challenges one has to deal with when working on the largest subsea cable project in the world.

Got feedback? Send it to us on Threads (https://threads.net/@metatechpod), Instagram (https://instagram.com/metatechpod) and don’t forget to follow our host Pascal (https://mastodon.social/@passy, https://threads.net/@passy_). Fancy working with us? Check out https://www.metacareers.com/.

Links

Timestamps

  • Intro 0:06

  • Introduction Andy 2:14

  • Introduction Pascal 3:21

  • Why do we build our own subsea cable infrastructure? 4:15

  • Current state of Meta-owned subsea cables 6:20

  • Project Waterworth 7:40

  • Why invest in more subsea cables? 9:00

  • What does a cable look like? 11:14

  • The process of laying subsea cable 16:39

  • Unexpected findings on the ocean floor 19:25

  • Shallow vs deep ocean 21:12

  • Merging different cable types 24:00

  • What happens when a cable breaks? 25:04

  • Memorable challenges 27:42

  • Cable capacity 29:51

  • The long history of subsea cables 33:07

  • What's next? 36:27

  • Outro 39:02

  continue reading

80 episodes

Artwork
iconShare
 
Manage episode 479822195 series 2390222
Content provided by Pascal Hartig. All podcast content including episodes, graphics, and podcast descriptions are uploaded and provided directly by Pascal Hartig or their podcast platform partner. If you believe someone is using your copyrighted work without your permission, you can follow the process outlined here https://podcastplayer.com/legal.

To ensure that everyone has access to resilient, high-speed and low-latency connections to Meta services, no matter where in the world they are, Meta makes large-scale investments into subsea cable infrastructure. The recently announced Project Water worth will, Once complete, reach five major continents and span over 50,000 km (longer than the Earth’s circumference), making it the world’s longest subsea cable project using the highest-capacity technology available.

In this episode, host Pascal talks with another Pascal and his colleague Andy who are involved at every stage of these projects and share the surprising challenges one has to deal with when working on the largest subsea cable project in the world.

Got feedback? Send it to us on Threads (https://threads.net/@metatechpod), Instagram (https://instagram.com/metatechpod) and don’t forget to follow our host Pascal (https://mastodon.social/@passy, https://threads.net/@passy_). Fancy working with us? Check out https://www.metacareers.com/.

Links

Timestamps

  • Intro 0:06

  • Introduction Andy 2:14

  • Introduction Pascal 3:21

  • Why do we build our own subsea cable infrastructure? 4:15

  • Current state of Meta-owned subsea cables 6:20

  • Project Waterworth 7:40

  • Why invest in more subsea cables? 9:00

  • What does a cable look like? 11:14

  • The process of laying subsea cable 16:39

  • Unexpected findings on the ocean floor 19:25

  • Shallow vs deep ocean 21:12

  • Merging different cable types 24:00

  • What happens when a cable breaks? 25:04

  • Memorable challenges 27:42

  • Cable capacity 29:51

  • The long history of subsea cables 33:07

  • What's next? 36:27

  • Outro 39:02

  continue reading

80 episodes

All episodes

×
 
Loading …

Welcome to Player FM!

Player FM is scanning the web for high-quality podcasts for you to enjoy right now. It's the best podcast app and works on Android, iPhone, and the web. Signup to sync subscriptions across devices.

 

Listen to this show while you explore
Play