Go offline with the Player FM app!
MetroLink facing ‘inevitable delay’
Manage episode 521280436 series 14262
Construction of the MetroLink rail line is now facing an ‘inevitable delay’ according to Transport Infrastructure Ireland, after a number of residents in Ranelagh lodged a High Court challenge against the decision to grant permission for the multibillion-euro project. We discussed further with Tom Phillips, from Tom Phillips and Associates and Adjunct Associate Professor of Town Planning, UCD.
8124 episodes
Manage episode 521280436 series 14262
Construction of the MetroLink rail line is now facing an ‘inevitable delay’ according to Transport Infrastructure Ireland, after a number of residents in Ranelagh lodged a High Court challenge against the decision to grant permission for the multibillion-euro project. We discussed further with Tom Phillips, from Tom Phillips and Associates and Adjunct Associate Professor of Town Planning, UCD.
8124 episodes
כל הפרקים
×Welcome to Player FM!
Player FM is scanning the web for high-quality podcasts for you to enjoy right now. It's the best podcast app and works on Android, iPhone, and the web. Signup to sync subscriptions across devices.